Abstract
This paper addresses one of the most important sources of magnetic fields: underground power cables. New design configurations for one, two, three and four cables per phase are presented from a magnetic field perspective. Different management techniques are studied in detail. Judicious placement of cable phases in multiconductor lines to reduce the field effect is implemented by computer modeling and simulations. The state-of-the-art magnetic field simulation package PCFIELD developed by EPRI is used to quantify and present the tool used to manage the field values. The new design configuration cases are very useful from a magnetic field point of view and have low cost schemes that can be easily implemented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.