Abstract

The uncertainties obtained with a novel method for measuring power losses in transformers are examined. These uncertainties are compared with those obtained by measuring power losses as the difference between input power absorbed and output power delivered and it appears that the new method does offer certain advantages with a suitable choice of instruments. Uncertainties are evaluated in compliance with the relevant CIPM recommendation adopted in 1981 and reaffirmed in 1986.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call