Abstract

AbstractAlthough artificial neural networks (ANNs) have been applied in rainfall runoff modelling for many years, there are still many important issues unsolved that have prevented this powerful non‐linear tool from wide applications in operational flood forecasting activities. This paper describes three ANN configurations and it is found that a dedicated ANN for each lead‐time step has the best performance and a multiple output form has the worst result. The most popular form with multiple inputs and single output has the average performance. In comparison with a linear transfer function (TF) model, it is found that ANN models are uncompetitive against the TF model in short‐range predictions and should not be used in operational flood forecasting owing to their complicated calibration process. For longer range predictions, ANN models have an improved chance to perform better than the TF model; however, this is highly dependent on the training data arrangement and there are undesirable uncertainties involved, as demonstrated by bootstrap analysis in the study. To tackle the uncertainty issue, two novel approaches are proposed: distance analysis and response analysis. Instead of discarding the training data after the model's calibration, the data should be retained as an integral part of the model during its prediction stage and the uncertainty for each prediction could be judged in real time by measuring the distances against the training data. The response analysis is based on an extension of the traditional unit hydrograph concept and has a very useful potential to reveal the hydrological characteristics of ANN models, hence improving user confidence in using them in real time. Copyright © 2006 John Wiley & Sons, Ltd.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call