Abstract
Uncertainties are predominant in hydropower development that lead to risks of time and cost overruns. The overruns’ assessment requires quantitative data that is difficult to obtain and sometimes partially or completely unavailable. Accordingly, this study proposes an expert fuzzy-based system for assessing the impact of uncertainties on time and cost overrun. A Bayesian network analysis is used wherein the experts’ opinions are incorporated through an analytic hierarchy process for the uncertainty’s likelihood and impact. A fuzzy inference system is used to incorporate the decision maker’s optimistic and pessimistic approaches. The proposed methodology is illustrated through a 3×42 MW run-of-river Myntdu Leshka Hydroelectric project in India. The project’s initial likely completion time was five years with a cost of ₹3,630 million at the 1999 price level. The results state that the project’s time and cost overruns lie between 158% and 196% and between 235% and 276%, respectively, under optimistic and pessimistic conditions. Such a methodology has not been applied by past studies for hydropower projects, which is the study’s main contribution. The methodology can be easily applied by construction project developers globally in different fields by varying the uncertainties, their likelihood, and impact scales as per different risk perceptions and regional conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.