Abstract
This paper discusses a joint problem of optimal project selection and scheduling in the situation where initial outlays and net cash inflows of projects are given by experts’ estimates due to lack of historical data. Uncertain variables are used to describe these parameters and the use of them is justified. A new mean-variance and a mean-semivariance models are proposed considering relationship and time sequence order between projects. In order to solve the complex problems, the methods for calculating uncertain lower partial semivariance and higher partial semivariance values are introduced and a hybrid intelligent algorithm which integrates genetic algorithm with cellular automation is provided. In addition, two examples are presented to illustrate the application and significance of the new models, and numerical experiments are done to show the effectiveness of the proposed algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.