Abstract

The U-shaped hanging ring was fractured in B phase fault tripping of a 220kV transmission line. They are analyzed by using macroscopic inspection of fracture, hardness test, chemical composition analysis, fittings load calculation, metallographic structure analysis and scanning electron microscopy analysis. The results show that there is a current flowing through the ground wire when the high-speed rail passes through. Poor contact between the U-shaped hanging ring and the clamp steel anchor caused heating and then high temperature wear. Long-term operation eventually led to fracture.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.