Abstract

The purpose of every offshore oil and gas pipeline is to transport fluid through a conduit from one point to another, but differences in field location, water depth, development strategy, time of sanction, seafloor topography, ownership and other factors means that installed mileage is expected to have complex site, time and location dependencies. The purpose of this review is to describe and illustrate the main factors that impact pipeline construction in the deepwater U.S. Gulf of Mexico. Understanding the nature of these dependencies and the manner in which factors interact and impact pipeline construction is the principal goal of this review. System attributes and their impact on activity drivers are described using a series of mini case studies. Lessons learned are synthesized and summarized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.