Abstract

We highlight a methodology of simulation of large-scale watershed mass transport, including landslide, debris flow, and sediment transport. A case study of Tsengwen reservoir watershed under the extreme rainfall triggered by typhoon Morakot is demonstrated. This approach starts with volume-area relation with landslide inventory method to predict temporal and regional landslide volume production and distribution. Then, debris flow model, Debris-2D, is applied to simulate the mass transport from hillslope to fluvial channel. Finally, a sediment transport model, NETSTARS, is used for hydraulic and sediment routing in river and reservoir. Near the water intake at the reservoir dam, the simulated sediment concentration is in good agreement with the measured one. The proposed approach gives good prediction and should help the management of reservoir operation and disaster prevention.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call