Abstract
The present paper briefly presents the general design of integrated monitoring system of the Livadia Palace building constructions placed on active Central Livadia Landslide system. A final part of comprehensive integrated real-time monitoring system has been installing as a part of the research activities by the Institute of Telecommunications and Global Information Space of National Academy of Sciences of Ukraine, a part of the research activities within the framework of the “Landslide protection structures and their development in the Autonomous Republic of the Crimea, Ukraine” IPL Project № 153 (headed by O. Trofymchuk) and a part of the research activities within the “Landslides and Cultural & Natural Heritage” (LACUNHEN) thematic Network of the ICL (headed by C. Margottini). The monitoring systems will consist of sensors for geodetic, hydrological and geotechnical monitoring of the Central Livadia Landslide system and accelerometers-inclinometers aimed at monitoring of the Livadia Palace building constructions. All monitoring equipment was combined in one system with continuous monitoring and data transmitting to the central data unit. Installation of the systems first part was finished in 2001 and final part was finished in 2010.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.