Abstract

The increasing penetration of renewable energy resources in power system has contributed to the increasing demand for operation flexibility. To address the deficiency of flexibility in wind-photovoltaic-storage hybrid system with deepening penetration of intermittent and uncertain renewable energy resources, this paper proposes emerging flexible resources including wind, photovoltaic and energy storage providing flexible ramp capacity to improve flexibility. Considering the uncertainty of load and intermittent generation, the wind-photovoltaic-storage providing flexible ramp capacity are integrated into a two-stage stochastic dispatch model including 1h day-ahead unit commitment and 15min real-time economic dispatch. To test the efficiency of the proposed model, simulation are carried out on a modified IEEE 118-bus with 54 thermal units, the results indicate that wind-photovoltaic-storage providing flexible ramp capacity can effectively alleviate the deficiency of operation flexibility, and improve the overall economic benefit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.