Abstract

In this paper, we investigate a specialized two-stage hybrid flow shop scheduling problem with parallel batching machines considering a job-dependent deteriorating effect and non-identical job sizes simultaneously. A novel concept of three-dimensional wasted volume based on the job normal processing time, job size, and job deteriorating rate is first proposed. Some structural properties, as well as a heuristic algorithm, are developed to solve the single parallel batching machine scheduling problem. Since the two-stage hybrid flow shop scheduling problem is NP-hard, a hybrid EDA-DE algorithm combining estimation of distribution algorithm (EDA) and differential evolution (DE) algorithm is proposed to tackle the studied problem. In addition, the Taguchi method of design of experiments (DOE) is implemented to tune the parameters of the EDA-DE. Finally, a series of computational experiments are carried out to compare the performance of the proposed hybrid EDA-DE algorithm and some recent existing algorithms from the literature, and the comparative results validate the effectiveness and efficiency of the proposed algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.