Abstract
Energy-efficient flexible job shop scheduling problems (EFJSP) have been investigated fully; however, energy-related objectives often have lower importance than other ones in many real-life situations and this case is hardly considered in the previous works. In this study, EFJSP with sequence-dependent setup times (SDST) is considered, in which total tardiness and makespan are given higher importance than total energy consumption. A two-phase imperialist competitive algorithm (TPICA) is proposed. The importance difference among objectives is implemented by treating all objectives equally in the first phase and making energy consumption not to exceed a diminishing threshold in the second phase. A dynamical differentiating assimilation and a novel imperialist competition with the enforced search are implemented. Extensive experiments are conducted and the computational results show that TPICA is very competitive for EFJSP with SDST.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.