Abstract
Disassembly scheduling is one of the important planning problems in disassembly systems, and generally defined as the problem of determining the quantity and timing of disassembling products in order to satisfy the demand of their parts or components over a planning horizon. This paper focuses on the case of multiple product types with parts commonality for the objective of minimizing the sum of set-up, disassembly operation and inventory-holding costs, and it suggests a two-phase heuristic in which an initial solution is obtained using a linear-programming relaxation, and then improved by perturbing the initial solution using a dynamic programming algorithm with look-ahead check. Computational experiments are done on a number of randomly generated test problems and the results show that the heuristic suggested in this paper can give near-optimal solutions within a short computation time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.