Abstract

Multiple-agent scheduling has attracted considerable research attention in recent years. However, studies of multiple-agent scheduling with release times and deadlines are few. In the presence of ready times, sometimes it is beneficial to wait for future job arrivals in constructing a schedule. Inspired by the importance of ready times, we study the single-machine two-agent scheduling problem with releases times and deadlines to minimise the number of tardy jobs of one agent under the restriction that the maximum lateness of the jobs of the other agent cannot exceed a given value Q. Having established that the problem is strongly NP-hard, we provide a branch-and-bound and a simulated annealing algorithm to search for the optimal and approximate solutions, respectively. The results of computational experiments reveal that the SA algorithm can generate near-optimal solutions quickly.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.