Abstract

A two-unit redundant system is studied, in which one unit is operative and the other is a warm standby which replaces the operative failed unit instantaneously. To increase system availability, the failure rate of the operative unit and the repair rate of the failed unit adjust automatically according to the state of the standby unit. Also, after repair of the operative failed unit it is sent for inspection to decide whether the repaired unit is perfect or not. If the repaired unit is found to be imperfect, it is sent for post repair. Using a regenerative point technique in the Markov renewal process, several reliability characteristics of interest to system designers and operation managers are obtained.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call