Abstract
The problem of train trajectory optimization of two successive trains on the same line is studied in this paper. The two-train optimal control problem is formulated by using the multiple-phase method of optimal control, in which the train schedules as well as train performance parameters and track gradients, curves and speed limits are taken into account. The objective is to ensure a smooth, safe, punctual, and energy-efficient train operation. A green-wave (GW) policy is adopted to ensure that the trains proceed safely under all green signals. Special objective functions and constraints are developed in case of train delays. The method is applied in a case study of two successive trains running on a railway line with various input delays showing the benefit of the GW policy and the ability of delay recovery.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.