Abstract

For disassembly sequence generation, partial disassembly and sequence dependent task times are typically not considered together in the same model. We developed a two-stage optimization program that first determines the optimal partial disassembly sequence according to reuse value only, followed by the second stage that finds the optimal partial disassembly sequence that also includes sequence dependence task times. We prove the optimality of the two-stage approach under the condition that all components with any positive reuse value must be included in the final sequence. If this condition does not need to be met, a task hedging policy is shown to be effective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.