Abstract

This paper presents a new uncertainty handling framework for optimal generation expansion planning (GEP) amalgamating the notions of single-stage and two-stage robust optimization (RO). The proposed multiyear robust GEP methodology, as a tractable mixed integer linear programming optimization problem, copes with the inherent planning uncertainties associated with forecasted electricity load demand, as well as estimated investment and operation costs through distribution-free bounded intervals producing polyhedral uncertainty sets. The optimal generation expansion plan obtained from the proposed RO approach is immunized against worst-case planning uncertainties considering the adopted degree of conservatism for each uncertainty set. Therefore, the proposed methodology is capable of controlling the robustness of the optimal investment schedule regarding the enforced planning uncertainties. Simulation results demonstrate the efficacy and efficiency of the proposed RO framework throughout GEP studies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.