Abstract

The input of water into a finite dam is a Wiener process with positive drift. Water may be released at either of two possible rates 0 or M. At any time the output rate can be increased from 0 to M with cost KM, (K ≧ 0), or decreased from M to 0 with zero cost. There is a reward of A monetary units for each unit of output, (A > 0). We will consider the problem of specifying an optimal control output policy under the following optimal criteria: (a) Minimum total long-run average cost per unit time. (b) Minimum expected total discounted cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.