Abstract

We study a scheduling environment that finds many real-world manufacturing applications, in which there is a close connection between a hybrid multiprocessor open shop and multiple parallel identical flow shops. In this environment, there is an extended two-stage open shop, where in one stage we have a set of parallel identical machines, while in the other we have a two-machine flow shop. Our objective is to minimize the makespan, that is, the latest completion time of all jobs. We pursue approximation algorithms with provable performance, and we achieve a 2-approximation when the number of parallel identical machines is constant or is part of the input; we also design a 5/3-approximation for the special case where there is only one machine in the multiprocessor stage, which remains weakly NP-hard. Our empirical experiments show that both approximation algorithms perform much better in simulated instances; their average ratios over the proposed lower bound are around 1.5 and 1.2, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.