Abstract
Considering the widely existing processing time uncertainty in the real‐world production process, this paper constructs a fuzzy mathematical model for the silicon single crystal production batch scheduling problem to minimize the maximum completion time. In this paper, a two‐stage hybrid optimization algorithm (TSHOA) is proposed for solving the scheduling model. Firstly, the improved differential evolution algorithm (IDE) is used to solve the order quantity allocation problem of silicon single crystal with different sizes to obtain the quantity of silicon single crystal rods with different sizes produced by different types of single crystal furnaces. Secondly, the variable neighborhood search (VNS) algorithm is adopted to optimize the order quantity sequencingof batch production processes. Finally, simulations and comparisons demonstrate the feasibility of the model and the effectiveness of TSHOA.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.