Abstract

A paint manufacturing firm's customers typically place orders for two or more products simultaneously. Each product belongs to a family that denotes batching compatibility during manufacturing. Further, products can be split into several sublots to allow overlapping production in a two-stage hybrid flow shop wherein various identical, capacitated machines operate in parallel at each stage. We present a mixed-integer linear program (MILP) for this integrated batching and lot streaming problem with variable sublots, incompatible job families, and sequence-dependent setup times. The model determines the number and size of sublots for each product and the production sequencing for each sublot such that the total weighted completion time is minimised. To promote practical implementation, we develop and evaluate heuristics to efficiently solve this problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.