Abstract

In this article, the application of the Multi-Skilled Resource-Constrained Flow Shop Scheduling Problem (MSRC-FSSP) in preventive maintenance as a case study has been investigated. In other words, to complete each maintenance order at each stage, in addition to the machine, a set of required human resources with different skills must be available. According to human resources skills, each of them can perform at least one order or at most N orders, and each maintenance order must be done by a set of human resources with different skills. To carry out a maintenance order, different human resources must be in communication and cooperation so that a preventive maintenance order can be completed. In this article, these resources are considered as technical supervisors, repairmen and maintenance managers who complete all maintenance orders in a flow shop environment as a job. For this problem, a new Mixed Integer Linear Programming (MILP) model has been formulated with the two-objective functions, minimizing total orders completion time and the human resources idle time. To solve the model on a small scale, CPLEX is used, and to solve it on a large scale, due to the fact that this problem is NP-Hard, a meta-heuristic algorithm named Genetic Algorithm (GA) is presented. Finally, the computational results have been done to validate the model, along with the analysis of the human resources idle time.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call