Abstract

The paper deals with the problem of minimizing the expected makespan in a two-machine flow shop with blocking and random job processing times. It is well known that it reduces to an instance of the traveling salesman problem (TSP). Assuming that the job processing times can be stochastically ordered on both machines, we show that the problem under study is equivalent to TSP on a permuted Monge matrix. This allows us to prove that it is NP-hard for the independently and exponentially distributed job processing times, and identify a new class of efficiently solvable special cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.