Abstract
This paper attempts to solve a two-machine flowshop bicriteria scheduling problem with release dates for the jobs, in which the objective function is to minimize a weighed sum of total flow time and makespan. To tackle this scheduling problem, an integer programming model with N 2+3 N variables and 5 N constraints where N is the number of jobs, is formulated. Because of the lengthy computing time and high computing complexity of the integer programming model, a heuristic scheduling algorithm is presented. Experimental results show that the proposed heuristic algorithm can solve this problem rapidly and accurately. The average solution quality of the heuristic algorithm is above 99% and is much better than that of the SPT rule as a benchmark. A 15-job case requires only 0.018 s, on average, to obtain an ultimate or even optimal solution. The heuristic scheduling algorithm is a more practical approach to real world applications than the integer programming model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.