Abstract
ABSTRACT Building Cost Index (BCI), unlike Construction Cost Index (CCI), had not been thoroughly explored in the existing body of literature. Both BCI and the CCI are two similar time series, with the only difference lying in the labour components used in their calculations. This study utilizes impulse-response functions to observe the different reactions of the BCI and CCI concerning labour conditions. The results indicate that the BCI consistently displays heightened sensitivity to fluctuations in labour supply and unemployment, whereas the CCI remains insensitive to such labour-related fluctuations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.