Abstract

The post-arc phase of a vacuum circuit breaker is a critical phase for dielectric recovery in the context of medium voltage current interruption. A 2-D hybrid model aimed at understanding this phase and at evaluating the risk of circuit-breaking failure during this phase has been developed. In this paper, we show how the recovery voltage expels the plasma from the gap and illustrate the influence of the shield polarity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.