Abstract

We consider the problem of scheduling deteriorating jobs or shortening jobs with two agents A and B. We are interested in generating all Pareto-optimal schedules for the two criteria: (1) the total completion time of the jobs in A and the maximum cost of the jobs in B, and (2) the maximum cost of the jobs in A and the maximum cost of the jobs in B. We show that all Pareto-optimal schedules for both problems can be generated in polynomial time, whether the jobs are deteriorating or shortening.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.