Abstract

AbstractVolatility in the supply chain of critical products, notably the vaccine shortage during the pandemic, influences livelihoods and may lead to significant delays and long waiting times. Considering the capital- and time-intensive nature of capacity expansion plans, strategic operational production decisions are required best to address the supply-demand mismatches given the limited production resources. This research article investigates the production scenarios where the demand of one agent must be completed within a specified due date, hereinafter referred to as the deadline, while minimizing the maximum or total completion time of another agent's demand. For this purpose, the Two-Agent Proportionate Flowshop Scheduling Problem with deadlines is introduced. Two polynomial-time optimization algorithms are developed to solve these optimization problems. This study will serve as a basis for further developing this practical yet understudied scheduling problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.