Abstract

The objectives of Task 5 were to review: (1) the extent of dredging, construction, and other sediment-disturbing activities conducted by the Tennessee Valley Authority (TVA) in potentially contaminated areas of Watts Bar Reservoir; and (2) the disposition of the materials from these activities. This memorandum is the final report for Task 5. This memorandum describes major activities in the Watts Bar Reservoir and Melton Hill Reservoir areas of the Clinch River that possibly resulted in significant disturbance of potentially contaminated sediments. TVA records from the construction of Watts Bar Dam, Kingston Fossil Plant, and Melton Hill Dam were reviewed to facilitate qualitative description of the effect of these activities in disturbing potentially contaminated sediments. The critical period for these activities in disturbing contaminated sediments was during or after 1956 when the peak releases of radioactive contaminants occurred from the Oak Ridge Reservation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.