Abstract

The paper presents a review of the average accelerator turnaround time in existing superconducting hadron machines (HERA at DESY@, RHIC at BNL§ and the TEVATRON at FNAL&). Based on the past experience with these previous hadron accelerators the paper aims at a best guess estimate for an initial and optimum turnaround time in the LHC during the first year of operation and for routine operation after the machine commissioning. @: Data on the operational experience with the HERA machine has been kindly made available by Bernhard Holzer from DESY. $: Data on the operational experience with the RHIC machine has been kindly made available by Wolfram Fischer from BNL. &: Data on the operational experience with the Tevatron machine has been kindly made available by Vladimir Shiltsev from FNAL and retrieved from the Tevatron operation Internet pages: http://www-bd.fnal.gov/pplot/index.html. We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 Structuring the European Research Area programme (CARE, contract number RII3-CT-2003-506395)

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call