Abstract

AbstractThe authors have proposed FRIENDS as a concept of the future electric power system. In order to realize FRIENDS, it is necessary to design the concrete interior structure and control scheme of the Quality Control Center (QCC) which is to be installed between distribution substation and customers. Hybrid‐type transfer switches are assumed to be installed on the high‐voltage side of the QCC to realize network reconfiguration. Some devices for handling power quality are also assumed to be installed on the low‐voltage side to realize customized power quality.In this paper, a novel control scheme for shutoff of the thyristor switches by the power quality handling devices is proposed and the effectiveness of the proposed scheme is investigated through momentary analysis using PSCAD/EMTDC. © 2002 Wiley Periodicals, Inc. Electr Eng Jpn, 142(1): 32–41, 2003; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/eej.10077

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.