Abstract

Summary Until the first quarter of 1979 we routinely rotary drilled our offshore vertical development wells with triconebits. Turbodrilling was introduced in the second quarter of 1979 for 17 1/2- and 8 1/2-in. [44.5- and 22-cm]hole sections and in the first quarter of 1980 for the 12 1/2-in.[31-cm]hole section. This resulted in avoiding and/or minimizing downhole problems and eliminating 7- and 4 1/2-in. [18- and 11 -cm] liners. As a result of introducing these practices a 50% time saving and a 30% cost saving has been achieved, equivalent to $550,000/well. Introduction This paper reviews the drilling performance for nondeviated development wells from the beginning of1978 to mid-1981 for three producing oil fields:Iddel Shargi field, where 35 wells have been drilled with an average depth of 7,900 ft [2408 m] and oil production of20,000 B/D [3180 m3/d],Maydan Mahzam field, where 35 wells have been drilled, with an average depth of 9,000 ft [2743 m] and oil production of 80,000 B/D[12 719 m3/d], andBul Hanine field, where 30 well shave been drilled, with an average depth of 9,300 ft[2835 m] and oil production of 195,000 B/D [31 003m3/d]. Three jackup rigs are operating. Ten exploration, appraisal, or development wells are being drilled and five wells are worked over per year. Fig. 1 shows the areas of operation. Overall, 23 wells have been drilled and completed during this period. Since mid-1981 most of the wells have been drilled as deviated wells, but in deeper horizonssome wells also are drilled for exploration. As a result of this, standard practices for directional drilling still are being established. Until the first quarter of 1979 the wells routinely were drilled by using rotary drilling techniques. The main problems encountered weredrillstring twistoffs in the 17 1/2-in. [44.5-cm] hole section,lost circulation and hole washouts in the17 1/2-in. [44.5-cm] hole section,swelling and cavingshale, and stuck pipe in the 12 1/2 -in. [31 -cm] holesection,differential pressure sticking in the Arab formation, andpoor penetration rates. To avoid or minimize these problems 7-in. [18-cm]liners were run in the Arab reservoir and 7- and 4 1/2-in.[18- and 11-cm] liners were run in the Uwain at reservoir. Along with the introduction of turbo drilling, the polymer drilling mud was improved and mud cleaners we reinstalled on all rigs. As a result of better mud control and new drilling procedures, downhole problems have been largely minimized. Because of this, it was no longer necessary to set liners in the Arab and Uwain at reservoirs. Drilling Techniques Turbodrilling. The application of the turbodrilling technique was pursued for the following general reasons.More power can be delivered to the bit by a downhole motor for a given power applied at surface.It is cost effective when drilling with high unitcosts, as generally are experienced when drilling with offshore mobile units.Running a turbine forces all drilling personnel to adhere to very standardized drilling practices.More effective bit optimization results because of standardized practices.High stress levels in the drillstring resulting from rotation can be reduced effectively by using a downholemotor.Higher speed of rotation suits diamond bits. Optimization of turbodrilling and bit design is carried out under very stringent economic rules as indicated in the following section. Optimization Method. To take full advantage of newdrilling bit technology but avoid the risk of costly trials by bit suppliers at our expense, the following policy has been developed for the case that bit suppliers submit a proposal for the use of a new bit type. On the basis of the actual performance of the presently used type(s), a norm for a certain rate of penetration and cost per foot (CPF) is set. If the actual CPF is higher, the extra expenditure is deducted from the bit cost. The fullbit cost is paid only if the drilling CPF is equal or lower than the norm used in the break-even calculation. This method has worked out favorably. Bits have been optimized, and further improvements still are being achieved while minimizing exposure to decrease in performance. Table 1 presents some technical information on turbodrills and a mud motor. The 26-in. [66cm] Hole Section. This section is rotarydrilled to about 650 ft [198 m] with rotary bits of the 1–1-1 type by using seawater and dumping returns atseabed. JPT P. 1727^

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.