Abstract

Tunnels constructed in soft soils give rise to displacements in existing structures surrounding the tunnel. Results are presented for a study conducted to estimate ground movements induced by protracted construction of Line 7 on the Tehran Metro, and compare them with data acquired with use of empirical finite-difference methods on a 3D model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.