Abstract

1. The use of a longitudinal dividing wall in the tunnel made it possible to dispense with construction of two independent tunnels for use in construction and operation and makes possible inspection and repair of equipment and construction of the conduit without interrupting its operation. 2. Construction of the surface spillway sill in the cofferdam between the bank and intake tower greatly reduces the volume of work on excavating an additional pit and improves operation of the hydrodevelopment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.