Abstract

During the construction of No.3 connection gallery between huyong station and lvdaohu station of first phase project of Line 2 Foshan Rail Transit, water and sand kicks caused the large-scale settlement of tunnel segments. After comparison and selection of schemes, the rehabilitation scheme of abandoning the existing right line tunnel, shield machine starting from huyong station and heading to Lvdaohu Station by changing the line, is finally adopted. In order to prevent secondary disasters caused by the collapse of abandoned tunnels, the ground boreholes are used to fill the abandoned tunnels. During the construction, a series of key construction technologies have been formed, such as sectional backfill of abandoned tunnel, alternate backfill of underwater concrete and mortar, and prevention of pipe blockage. The results of core-drilling test and subsequent construction procedures show that the treatment scheme of abandoned tunnel is reliable and feasible, which can provide reference for similar projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.