Abstract
The existing biochemical system in the coke plant at Bhilai Steel Plant is inspected and assessed, with a view to introducing nitrification and denitrification, without reconstruction. It is shown that the existing biochemical-treatment facility will accommodate a nitrification and denitrification system capable of processing coke at a rate of 3.0–3.5 million t/yr. With reconstruction of the aeration system, the throughput may be increased to 4.8 million t/yr. That entails continuous dosing of alkaline reagent in the treated water. Recommendations are made for improved operation of the biochemical system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.