Abstract
Aiming at medium distance transportation of excavated spoil and constructional components in the tunnelling process, this paper combines with a water-conveyance tunnel engineering and analyzes the influence factors that affect the construction efficiency of earth pressure balance shield(EPB shield), and then works out an available scheme based on that the transport link should well match with shield tunnelling. The field condition indicates that the equipment lectotype, marshaling and transport organization in this scheme guarantee the transport capacity and continuity for tunnelling, which ensures construction progress. The idea in this design can provide similar engineering with reference.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.