Abstract

In transportation planning there can be long lead times to adapt capacity. This paper addresses two questions. First, in a one mode world (say rail or road), what is the optimal capacity choice when faced with uncertain demand, long lead times and congestion. Using a simple analytical model it is shown that when demand is inelastic, it is socially optimal to invest more than if only the expected level of demand is taken into account. In this case it may be beneficial to over invest in capacity because congestion costs are a convex function of relative use. This result holds with or without optimal tolling. The second question deals with two competing modes and where only one mode has long lead times for capacity while the other has flexible capacity. This is typical for the competition between High Speed Rail and air for the medium distance trips (500 to 1000 km), or for the competition between inland waterways and trucks for freight. We find that over investment is less justified because the substitute mode can more easily absorb the high demand outcomes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.