Abstract

Abstract This paper develops an efficient methodology for protection screening of large-scale transmission systems as part of the planning studies for the integration of offshore wind power plants into the power grid. This methodology avails to determine whether any upgrades are required to the protection system. The uncertainty is considered in form of variability of the power generation by offshore wind power plant. This paper uses the integration of a 1000 MW offshore wind power plant operating in Lake Erie into the FirstEnergy/PJM service territory as a case study. This study uses a realistic model of a 63,000-bus test system that represents the U.S. Eastern Interconnection.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.