Abstract
Summary form only given. This paper shows the importance of optimizing the transmission system parameters from its conception, considering altogether the relevant options and possibilities, in order to have the better cost-performance result. The presented results were obtained in the study of a real transmission system expansion, based on an 865 km long line. The single-phase auto-reclosing (SPAR) procedure was one of the aspects carefully studied, in order to assure adequate transmission reliability. The secondary arc current was mitigated through the traditional solution of using the neutral reactor on the existing shunt reactor banks, which permitted the reduction of the secondary arc current to acceptable values, assuring natural arc extinction and successful SPAR. The way of obtaining the optimized value for the neutral reactor and its implications on the system performance are important aspects, which are discussed in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.