Abstract
This paper describes the study methodology for network planning based on reconfiguration transmission network to Facilitate operate the network in reliable, secure and efficient way. All operating areas within country grid are interconnected through transmission network which consider as a source feeding sub transmission network. The underlying sub transmission network, being electrically parallel to the overlying transmission loop; has caused operational difficulties [1], especially during certain outages. Reconfiguration the sub transmission network to avoid this parallel configuration between Extra High Volt (EHV) Transmission and HV sub-transmission networks by the method called bulk supply EHV/HV stations (BSPs) groups in this paper, each BSP feed one group of 5 or more HV/MV substations connected. BSPs groups planned to be connected through EHV Transmission network and disconnected in HV sub- transmission network in case of normal operation by normally open HV Transmission Lines (HVTL). This planning method will briefly described with its advantages in following sections.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.