Abstract
In long range transmission planning, where new load growth, new generation sites and perhaps a new voltage level are to be considered, a computer aided method of visualizing new circuits in a network context is needed. The new method presented meets this need by the combined use of a linear (dc) power flow transmission model and a transportation model (also known as a trans-shipment model). The dc transmission model is solved for the facilities network by obeying both of Kirchhoff's laws, flow conservation at each bus and voltage conservation around each loop. The transportation model is solved for the overloads by obeying only the bus flow conservation law while minimizing a cost objective function.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.