Abstract

Electric power systems are extremely complex. Therefore, system operators and planners are faced with difficult problems, which are uncertainty of power system. Also, they have to obtain best efficiency with least cost of investment. Transmission network expansion planning (TNEP) vases on reliability, and considers economic aspect. This paper presents well-being method and cost-optimization method to solve the transmission expansion planning problem. Basic principle of cost-optimization is similar to fundamental principle of economics. When practical use of resources increases, it means that must endure more risk. Well-being method can briefly estimation state probability by capability and calculate reliability in system. Methods: first, calculate cost-optimization method, and obtain optimal system capability of present system. Second, use the optimal capability, well-being method shows system state probability. Finally, identify system probability, and determine future planning. To demonstrate the efficiency of the suggested methods, these methods are applied to IEEE-RTS 24 bus system. The result of these methods shows the reliable transmission expansion planning through IEEE-RTS 24 bus

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.