Abstract

One aspect of long-range planning of electric power systems involves the exploration of various designs for the bulk power transmission network. The use of linear programming for network analysis to determine where capacity shortages exist and, most importantly, where to add new circuits to relieve the shortages is presented. The new method of network estimation produces a feasible transmission network with near-minimum circuit miles using as input any existing network plus a load and generation schedule. An example is used to present the two steps of the method: 1) linear flow estimation and 2) new circuit selection. The method has become a fundamental part of computer programs for transmission network synthesis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.