Abstract

In a deregulated electricity market, it may always not be possible to dispatch all of the contracted power transactions due to congestion of the transmission corridors. The ongoing power system restructuring requires an opening of unused potentials of transmission system due to environmental, right-of-way and cost problems which are major hurdles for power transmission network expansion. Flexible ac transmission systems devices can be an alternative to reduce the flows in heavily loaded lines, resulting in an increased loadability, low system loss, improved stability of the network, reduced cost of production and fulfilled contractual requirement by controlling the power flows in the network. A method to determine the optimal location of thyristor controlled series compensators has been suggested in this paper based on real power performance index and reduction of total system reactive power loss.

Highlights

  • In a competitive electricity market, congestion occurs when the transmission network is unable to accommodate all of the desired transactions due to a violation of system operating limits

  • Congestion management is an important issue in deregulated power systems

  • Flexible AC Transmission Systems (FACTS) devices such as TCSC by controlling the power flows in the network can help to reduce the flows in heavily loaded lines

Read more

Summary

INTRODUCTION

In a competitive electricity market, congestion occurs when the transmission network is unable to accommodate all of the desired transactions due to a violation of system operating limits. FACTS devices by controlling the power flows in the network without generation rescheduling or topological changes can improve the performance considerably[4,5,6] The insertion of such devices in electrical systems seems to be a promising strategy to decrease the transmission congestion and to increase available transfer capability. Using controllable components such as controllable series capacitors line flows can be changed in such a way that thermal limits are not violated, losses minimized, stability margins increased, contractual requirement fulfilled etc, without violating specific power dispatch. The results show that above algorithm is suitable for relieving congestion and getting economical results

MATERIALS AND METHODS
RESULTS AND DISCUSSION
CONCLUSION
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.