Abstract
<abstract> <p>The greenhouse gas (GHG) emissions contribution from power generation in Indonesia reaches 40% of the total (GHG) emissions in the energy sector because of the use of fossil fuels. The government aims to minimize GHG emissions in the power generation sector, one of which is the phase-out of coal power plants and replacing them with integrated photovoltaic (PV) power plants with battery energy storage systems (BESS). A cost-benefit analysis compared two development scenarios for 2023–2060. The base scenario continues developing coal power plants, and the phase-out scenario replaces coal power plants with integrated PV power plants and BESS. The analysis is solely focused on the financial costs and benefits for power plant investors. The results indicate that the present value of costs for the base scenario from 2023–2036 is initially lower compared to the phase-out scenario. However, in the long term, the costs of the phase-out scenario will gradually decrease and become more affordable. The benefit-cost ratio for the phase-out scenario is 2.36, while the base scenario is 2.12, indicating that the phase-out scenario is more prospective for future development. Additionally, the phase-out scenario has the advantage of achieving the net-zero emissions target by 2056 compared to the base scenario.</p> </abstract>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.