Abstract
An optimized maintenance strategy is being pursued in the nuclear power industry, so as to reduce the maintenance cost and improve equipment reliability. Transition from time-based preventive maintenance (TBM) to Condition-based Maintenance (CBM) or Predictive Maintenance (PdM) is being set as a site initiative by different utilities. This paper analyzes the key elements a plant should focus on to achieve a successful CBM transition; discusses the implementation steps and matters needing attention for the pilot project of CBM transition; and depicts precursors for CBM such as CBM equipment scope screening, equipment failure history collection, failure mode and degradation mechanism analysis, monitoring parameters and frequency setting, CBM result evaluation, and CBM planning. The paper also discusses the impacts and challenges of CBM transition campaign to the existing production scheme.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.