Abstract
One of Saudi Aramco's gas exploration expansion plans consists of powering an offshore platform via a 13.8 kV, 56 km subsea cable. Under various loading conditions on the offshore platform, voltage fluctuation and control becomes problematic. The installation of a 13.8 kV shunt capacitor bank (SCB) and shunt reactor bank (SRB), was initially introduced to remedy voltage control. During transient analysis, under faulty conditions adjacent to the SCB, the 13.8 kV circuit breaker (CB) will be exposed to an excessive transient recovery voltage (TRV) exceeding the limit of the 13.8 kV CB. The harmonic analysis also indicated high values on the 5 th , 7 th and 11 th harmonic voltage distortion. A comprehensive power system analysis was undertaken to investigate mitigation measures. The installation of a Static Synchronous Shunt Compensator (STATCOM) was retained as it will eliminate the need of a SCB and SRB with the high TRVs and resolve the harmonic problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.