Abstract

An interconnected power system containing synchronous and induction machines has been simulated. The total fault current and the behavior of each machine have been calculated under three-phase to ground faults and single line to ground faults for a transient time of 500 ms. A comparison between the 3-phase to ground fault and single line to ground fault has been presented for each machine with respect to the total fault current, torque, rotor angle and speed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call